Date (dd.mm.yyyy)
+ working hours
Pictures and stories  
 19.04.2001
0 h
I sent order of plans to Zenith Aircraft  
26.04.2001
0 h

Airmail

This was all, what I got by airmail from Zenair :-) Cost was 335 U$.

Construction and tools

There was this letter size binder, which included building instructions and some black & white detailed picture pages.

Drawings

There were also these CAD drawings of the plane (63 pages).
All components were detailed quite perfectly.

Aluminum works

This is my garage, where I will build necessary lights, power outlets and working table in next weekend.

Jigs

This is my "wood hobbies room", what I will use to build all necessary jigs.

Electric

As I'm electronic designer, I have my own "laboratory". There I will build strobos, servos for trim and flaperons, LCD screen for GPS-map, fuel meters, temperatures etc... This Hammond, what you see here, will be hopefully repaired before I need this room for aircraft components. Yes, I play keyboards in our local "jamming"-bar :-)


 28.04.2001
2 h
Material calculating

There is a awfull weather outside and garage project will be pushed later. So, I decide to calculate materials for wings and create order for Lasercoat Oy, who will deliver all required aluminium for my plane.
 
30.04.2001
6h
Cutting jig 1

Today I bought plywood for wing jigs. Required for bending jigs for ribs. Plywood size was 1550 x 1250 x 21mm.
Cost was about 20 U$


Cutting jig 2

First thing is to mark all "check points" to plywood. There is numerical table in drawings, which includes all necessary position information for curve points.
This jig is for aluminium cutting. So, almost every size of jig needs to be expanded 17mm. Only nose curve has 3mm expansion.

Cutting jig 3

Curve ruler was too short for rear rib, so I used thin woodstick with little nails to get correct rib curve.
Stoled from the flower-pot :-).

Completed jig drawings

Wing rib jig drawings finished.
Right now we have few days holiday in here, in Finland and I will put this project for hold tomorrow. I need to go barbegue now. Bye!

 
 01.05.2001
2h



At this point, tolerance is under 0.5 mm, and I don't use sand paper yet!
Next I need to make 8 degrees obliques for bending jigs.

 
02.05.2001
4h



Finished paper works (construction licence application) for our local EAA. Under paper is more plywood for inner wing rib jigs.
 
 06.05.2001
4h

 

Inner wing ribs.



Fine tuning for left/right ribs. Right now, they are exactly same side and shape.

 
20.05.2001

I'm so sorry for delay of these pages!
I really had so much to do with my apartment.

Next (at beginning of june) I need to visit our neighbour country, Sweden. There is a cheapest place under 1000 miles to get 6061 etc. aluminium. Company name is Arigoteknik Ab, and it has own www-pages: http://www.arigoteknik.se
 
 21.05.2001
 "Anti collision" strobo system under construction.

Flash control unit

This control unit can drive simultaneously several strobo units. It has double-flash & single flash capability.



Strobo tube unit under radio-noise and strobo tube voltage measuring



This was GREAT test. Tube unit didn't create any radio interferences! Just a very little "snap" can heard, when tube unit was under 10 cm from receiver



Strobo unit just before "cast plastic?", which is required for insulation of water and electric shortcuts.

I will insert all necessary schematics to my www-pages, if you would like to build these kind of strobos by yourself.
There will be available new www-page for schematics in couple days.
 

08.06.2001

YES! Building licence arrived. Thanks goes to our local experimental organisation, specially to Markku Hiedanpää and civil aviation administration.

The plane will be placed to normal experimental category. So, I don't need to get ultra light-licence for it! I have PPL(A) already and it's more than enough.

 

13.08.2001

Ok, my summer holiday has gone :-( and I can continue with my plane project :-)

I hope, that Arigoteknik can supply my aluminiums as soon as possible, because I didn't have enough time in summer holiday to visit there. So, they need to send them by cargo... I hope, they can collect ALL ordered materials at once, since they haven't 0.016" 6061-T6 sheets at July on their stock....

As you see, my carage has quite a lot of light power :-) 5 pieces 150W halogen and double tube fluorescent lights. Believe me, it's much easier work with good lights!

You never have too much outlets! On each wall and even ceiling...

There is all required plans for wings on the wall. I don't mess my papers with aluminium dust by my hands and I don't need to check details from binder all the time.

 

14.08.2001

 

GPS prototype works fine. Next thing to do; 16 bit processor and FLASH memory to save graphic maps...

 

16.09.2001


 

I have a little 2024-T3 aluminium for bending and riveting tests. So, I deside test bending first...

Hey! This was EASY! No cracks and even tightest curve was easy to bend. It took only ten minutes to bend first test rib.

Next I will bend all ribs..

 

Building wing ribs

26.10.2001
9h

27.10.2001
14h

28.10.2001
7h

29.10.2001
4h

30.10.2001
5h

31.10.2001
3h

 

 

Rear rib sheets. 12 pieces... Cutting these took about 5 hour with all testing.

Just before bending...

You need only a little hammer and piece of wood for this.....

First rib without lightening holes...

Primer...

POP-rivets...

{short description of image}

Solid rivets...

Now I have FREE www-space for all construction pictures without any banners! Thanks goes to Jussi Paju.

MORE WING CONSTRUCTION PICTURES


29.10.2001: Okay, all wing ribs has been bended. Next thing is to create lightening holes and flang them with jigs maded by nylon. When all lightening holes are ready, I start to fix flanges with quite simple tools... (2 pieces 10mm diameter steel rods, soldered together...) Tolerance (shape) is 1mm right now and after fixing,... just gues...


Rev-4 plans arrived... (Increasing maximum weight up to 1100 lbs)

 

Fuel tanks.

30.11.2001
1h

1.12.2001
2h

6.12.2001
3h

10.1.2001
3h

"Pre-work" for fuel tanks...

FUEL TANK CONSTRUCTION PICTURES


10.01.2001: Fuel tanks was soldered today by Elektrometalli Oy. Very nice work indeed!

 

Wing spars

9.12.2001
4h

16.12.2001
4h

17.01.2002
3h

19.01.2002
2h

24.03.2002
5h

29.03.2002
4h

30.03.2002
3h

31.03.2002
5h

Today I cut wing spars...

MORE WING CONSTRUCTION PICTURES


1.1.2002

Arigo Teknik has started delivering my parts... YES! Now I'm happy...

17.1.2002

Aluminium sheets... delivered by truck from Sweden. (Arigoteknik Ab)

Aircraft factory :-)

Too small carage...

Too small carage...

24.03.2002: Great! Final shipment arrived on Friday from Arigo Teknik, from Sweden.

4130N chrome-molybden tubes, 6061-T6 tubes and 6061-T6 L-profiles...

The rest of .016 sheets for fuselage...

 

Constructing
rudder

20.01.2002
7h

23.01.2002
5h

27.01.2002
6h

MORE RUDDER CONSTRUCTION PICTURES

 

Constructing
right wing skeleton

4.4.2002
6h

5.4.2002
7h

6.4.2002
6h

7.4.2002
5h

8.4.2002
4h

11.4.2002
3h

14.4.2002
3h

16.4.2002
5h

19.4.2002
5h

Too small carage...

 

Constructing
stabilizer

3.2.2002
2h

8.2.2002
5h

12.2.2002
5h

21.2.2002
3h

25.2.2002
1h

STABILIZER CONSTRUCTION PICTURES

 
 
18.4.2002

 

Simple way to prevent "oil can" effect on wings (& fuselage). Take piece of .025 sheet and make L-stiffeners 17x17mm, flang them to correct shape and rivet them directly to the wing skin middle of ribs 2-3, 4-5 and 5-6 (top and bottom skins and same direction as rear ribs). Couple test pictures below. You don't need to rivet these to front and rear spars at all!

 

20.4.2002
2h

15.5.2002
8h

5.6.2002
6h

6.6.2002
6h

7.6.2002
4h

16.7.2002
5h

24.7.2002
5h

28.7.2002
4h

29.7.2002
4h

14.8.2002
3h

15.8.2002
3h

Installing right wing skins & fuel tank.

14-15.8.2002: Fighting with wing tip...

 

Rear fuselage

3.9.2002
2h

6.11.2002
2h

8.11.2002
3h

9.11.2002
4h

13.11.2002
2h

18.11.2002
2h

1-2.12.2002
3h

3.12.2002
4h

4.12.2002
2h

6.12.2002
4h

8-10.12.2002
10h

12.12.2002
4h

16.12.2002
1h

MORE PICTURES ABOUT REAR FUSELAGE  

Total
build time

=271h

 

 

09:00
??.??.2002
(-2003)
Climb

There is the aim!